Turn a cost signal into an engineering review.
Find the resource behind a charge, inspect its utilization and prepare the owner's next step. Review dependencies and workload needs before testing a change.
Explore a sample review
Prepare a change your team can test
A low-utilization finding starts an investigation, not a resize. Agree the workload's peak needs and service targets, then prepare a bounded test with a rollback path.
- Check current configuration and collected evidence.
- Confirm missing signals and business requirements.
- Record dependencies, safe testing and rollback.
Virtual machine · West Europe
14 daily readings · not a capacity guarantee
Read all 14 CPU samples
| Day | CPU |
|---|---|
| 1 | 6% |
| 2 | 11% |
| 3 | 8% |
| 4 | 7% |
| 5 | 16% |
| 6 | 10% |
| 7 | 8% |
| 8 | 5% |
| 9 | 7% |
| 10 | 22% |
| 11 | 12% |
| 12 | 8% |
| 13 | 6% |
| 14 | 9% |
- Resource and billing context
- 14-day CPU sample
- Configured team: Developer experience
- Memory utilization
- Disk IOPS and performance
Confirm peak build needs, dependencies, a safe test and rollback before changing capacity.
After the test, check service performance first, then matching-period usage and billed cost.
Work through a VM sizing decisionYour starting point
A cost increase without a clear resource, owner or safe implementation decision.
What Costframe adds
Resource-level charges, available configuration, retained evidence and reviewable findings.
The next team discussion
The evidence window, missing telemetry, owner requirements and a proposed test/rollback plan.
Check workload constraints before choosing capacity.
CPU alone is not proof of spare capacity. Memory, IOPS, dependencies and peak requirements need review. Supported guidance is non-executing; it does not create Terraform/CLI commands or modify customer resources.
Azure is generally available. AWS is a private pilot and Google Cloud a private preview. Evidence coverage, native currency and permissions remain explicit; your team implements changes outside Costframe.
Provider scope and setupReview one workload before planning a change.
Bring its evidence window, dependencies and rollback criteria to the owning team.